Permits, interconnection and install in one sequence

Site assessment to commissioning, with every approval you are waiting on — and how long it has been waiting — in one place.

What we hear

What usually goes wrong in solar

Most of the job is waiting on somebody else

Building permit, electrical permit, the utility's interconnection application, two inspections. A job can sit for sixty or ninety days, and the question you cannot answer is whose turn it currently is.

One array, several trades, in a fixed order

Roof work, racking, electrical, sometimes a service upgrade first. Each is a crew day, and getting them out of order costs you a return trip with a lift already sent back.

The customer asks about paperwork you are holding

Incentive and tax documents, equipment spec sheets, the signed design. They belong attached to the job, not in an email thread you have to search by the customer's last name.

What you find on the roof changes the design

Shading you did not see from the street, rafter spacing, a roof with four years left, a panel with no room for another breaker. The array changes, the price has to change with it, and often it quietly does not.

Your pipeline

The stages we would set up on day one

Not a blank board. These are the steps your work already moves through, named the way you already name them — and you can rename or reorder any of them yourself.

  1. 01Lead
  2. 02Site Assessment
  3. 03Design & Proposal
  4. 04Signed
  5. 05Permits Filed
  6. 06Interconnection Applied
  7. 07Materials & Crew Scheduled
  8. 08Install
  9. 09Inspections
  10. 10Utility Approval & Commissioning
  11. 11Invoiced
  12. 12Closed

Stage checklist

Permits Filed

Move a job into this stage and these appear automatically, each one already assigned to whoever owns it.

  • Building permit filed with the town
  • Electrical permit filed
  • Stamped structural letter on file where the town asks for one
  • Interconnection application submitted to the utility
  • Equipment spec sheets and the signed design attached to the job
  • Customer told the realistic timeline, in writing, from today

Tracked against jobs

  • Modules by count and wattage
  • Inverters, optimizers and rapid shutdown devices
  • Racking, rails, flashings and lag stock
  • Conduit, wire, disconnects and breakers
  • Lifts, staging and roof anchors

Questions

Solar, specifically

Does it file permits or talk to the utility for me?

No, and nobody can — there is no interconnection API to call, and most towns still want a person and a form. What it does is track where every application sits, how many days it has been there and who is supposed to act next, which is the part that actually goes wrong.

Can it cope with a job that stalls for two months?

That is the normal case in solar, so it is built for it rather than around it. Every job shows how long it has been in its current stage, which separates the ones that are waiting normally from the ones somebody forgot to follow up.

What about service calls on systems we installed?

A short job against the same address, with the original install already attached — inverter model, module count, as-built photos, the spec sheets. You know what is on that roof before you drive out to it.

Get in touch

Let's talk about your solar business

Based in Nashua, NH, working with contractors across New Hampshire. One call, no obligation, and an honest answer about whether we can help.

0/4000

Goes straight to my inbox. No newsletter, no CRM sequence, no sharing it with anyone.