Prep hours and color schedules, written down where the crew can see them
Prep is where the hours go and color is where the mistakes go. Both belong somewhere the crew can check without calling you.
What we hear
What usually goes wrong in painting
Prep is the job, and it is always underestimated
Scraping, sanding, caulking, priming bare cedar. Quoted as two days because that is what it felt like, and then it is five. By the time you know, the margin is already gone.
Color and sheen get relayed verbally and go wrong
Trim in semi-gloss, ceilings flat, the accent wall in the back bedroom in the darker one. One wrong wall is a day of rework, a gallon you ate and a conversation nobody enjoys.
Scope creeps one room at a time
While you are here, could you do the hallway? Three of those and you are a week over with nothing extra to bill, because each one individually felt too small to write up.
The punch list holds the final payment
Two touch-ups and a closet nobody got to keep a five-figure invoice sitting for a month, because the list is in somebody's head and no single item has an owner.
Your pipeline
The stages we would set up on day one
Not a blank board. These are the steps your work already moves through, named the way you already name them — and you can rename or reorder any of them yourself.
- 01Lead
- 02Walkthrough & Estimate
- 03Proposal Out
- 04Approved & Scheduled
- 05Colors Confirmed
- 06Prep
- 07Prime
- 08Paint
- 09Punch List
- 10Invoiced
- 11Closed
Stage checklist
Colors Confirmed
Move a job into this stage and these appear automatically, each one already assigned to whoever owns it.
- Every room or elevation listed with its color and sheen
- Trim, ceiling and door colors confirmed separately
- Customer sign-off on the color schedule, in writing
- Paint ordered by product line and sheen, quantities off the square footage
- Test patches done anywhere the customer was unsure
- Color schedule on the crew's phones before day one
Tracked against jobs
- Paint and primer by the gallon, per color and sheen
- Caulk, spackle, sandpaper and tape
- Drop cloths, plastic and masking
- Sprayers, ladders and staging
- Prep hours against the estimate
Questions
Painting, specifically
Where does the color schedule live?
On the job, room by room, so a painter opens their phone and sees exactly what goes where in what sheen. The most common callback in painting is not bad work, it is the right paint in the wrong place.
Can it track prep separately from painting hours?
Yes, and it is the one number worth watching daily. Prep logged against the estimate tells you by the end of day two whether the job is in trouble, which is while you can still do something about it.
How do we handle the extra room somebody asks for mid-job?
As a change order added on the spot with a price on it, so it is a yes with a number rather than a favor. It takes about thirty seconds and it is the difference between a good month and a busy one.