Septic installs and service, tracked end to end
Design approval, state permit, install, inspection, as-built — the sequence that cannot be shortcut, with nothing falling between the steps.
What we hear
What usually goes wrong in septic
Approvals are a waiting game with no visibility
One design sits with NHDES, another sits with the town, a third waits on a soil test. Nobody can tell you which jobs are actually ready to dig next week without opening a filing cabinet.
Inspections get scheduled by memory
The inspector has to see it open. Backfill before that happens and you are digging it up again on your own dime.
Service and install are two businesses in one truck
Pumping routes and tank alarms run on a recurring clock. New installs run on permits. Most software is built for one or the other and makes you fight it for the rest.
As-builts get requested years later
A homeowner sells the house and the closing needs the as-built. If it is in a box in the garage, that is an afternoon gone.
Your pipeline
The stages we would set up on day one
Not a blank board. These are the steps your work already moves through, named the way you already name them — and you can rename or reorder any of them yourself.
- 01Lead
- 02Site Evaluation & Soil Test
- 03Design Submitted
- 04Approval Received
- 05Permits & Scheduling
- 06Materials & Equipment Assigned
- 07Install In Progress
- 08Inspection
- 09As-Built & Close
- 10Invoiced
Stage checklist
Inspection
Move a job into this stage and these appear automatically, each one already assigned to whoever owns it.
- Confirm inspector appointment and time window
- System open and accessible for inspection
- Approved design on site
- Photos of tank, distribution box and bed before backfill
- Inspector sign-off recorded
- Backfill released to the crew
Tracked against jobs
- Tanks, distribution boxes and risers
- Chambers, pipe and stone by the yard
- Pumps, floats and alarm panels
- Excavators and dump trucks
- Filter and riser stock for service calls
Questions
Septic, specifically
Can it track recurring pumping customers alongside installs?
Yes. A service customer carries a next-due date and generates its own short job when that date comes around, while installs run through the full permit and inspection pipeline. One board, two rhythms.
Where do as-builts and approvals live?
Attached to the job, so searching the address finds every document for that system: the approved design, the permit, inspection photos and the as-built. When a closing attorney calls in four years it is a search rather than a scavenger hunt.
Does it submit to NHDES for me?
No, and no honest vendor will tell you otherwise, because there is no submission API to talk to. What it does is track where each design sits, how long it has been there, and whose turn it is to act, so nothing waits on the state longer than it has to.