From rough-in to final inspection
Permits, rough-in, inspection, final — in the order the inspector expects, with the paperwork already done.
What we hear
What usually goes wrong in electrical
Inspections gate everything and get missed
Rough-in has to pass before it is closed up. One forgotten call and a wall comes back open.
Service work and project work compete
A panel upgrade quoted in March, a dead circuit called in this morning. Both are real, and neither should push the other off the board.
Material takeoffs never match the truck
Wire, boxes and devices get pulled from stock and never logged, so job cost looks better than it is and the shelf is empty when you need it.
Generator and EV charger work has its own steps
Utility coordination, load calculations, commissioning. Different enough that a generic checklist does not cover it.
Your pipeline
The stages we would set up on day one
Not a blank board. These are the steps your work already moves through, named the way you already name them — and you can rename or reorder any of them yourself.
- 01Lead
- 02Walkthrough & Quote
- 03Proposal Out
- 04Permit Filed
- 05Materials Assigned
- 06Rough-In
- 07Rough Inspection
- 08Trim & Devices
- 09Final Inspection
- 10Invoiced
Stage checklist
Rough Inspection
Move a job into this stage and these appear automatically, each one already assigned to whoever owns it.
- Permit posted and visible on site
- All boxes set, secured and at correct depth
- Circuits labeled at the panel
- Grounding and bonding verified
- Inspection scheduled with the town
- Pass recorded before insulation or drywall is released
Tracked against jobs
- Wire and cable by the foot
- Panels, breakers and disconnects
- Boxes, devices and plates
- Fixtures staged per job
- Generators and EV charging equipment by serial
Questions
Electrical, specifically
Can each stage have its own checklist?
Yes, and you control them. Rough-in has one list, final has another, and you edit them yourself as your process changes. No support ticket, no consultant.
Does it track material pulled from the shop?
Material gets allocated to a job, which both charges the job and draws down the shelf, so job cost and what is actually in stock stay honest.
Can I keep per-apprentice task lists?
Every task has exactly one owner. An apprentice opens the app and sees only their own work, soonest first, and that is the whole screen.
Get in touch
Let's talk about your electrical business
Based in Nashua, NH, working with contractors across New Hampshire. One call, no obligation, and an honest answer about whether we can help.