Weather-driven scheduling that holds up

Measurements, material drops and crew assignments that survive a week of rain and a full reshuffle.

What we hear

What usually goes wrong in roofing

Material drops and crew days have to line up

Shingles on the roof a day early is fine. A crew on site with no material is a day you paid for and cannot bill.

Insurance jobs carry extra paperwork

Scope, supplements, adjuster contact, documentation photos. Different enough from a retail job that the same checklist does not fit.

Weather invalidates the schedule weekly

You are not scheduling, you are constantly rescheduling, and the crew needs to know without a phone tree.

Punch lists and final payments stall

One ridge vent detail holds up a five-figure invoice for three weeks because nobody owns the item.

Your pipeline

The stages we would set up on day one

Not a blank board. These are the steps your work already moves through, named the way you already name them — and you can rename or reorder any of them yourself.

  1. 01Lead
  2. 02Inspection & Measure
  3. 03Proposal Out
  4. 04Approved / Insurance Scope
  5. 05Material Ordered & Dropped
  6. 06Crew Assigned
  7. 07Tear-Off & Install
  8. 08Punch List
  9. 09Invoiced
  10. 10Closed

Stage checklist

Material Ordered & Dropped

Move a job into this stage and these appear automatically, each one already assigned to whoever owns it.

  • Squares confirmed from the measurement
  • Color and product confirmed with the customer in writing
  • Delivery scheduled to land before the crew
  • Dumpster ordered and placement agreed
  • Property protection plan set with the homeowner
  • Crew and start date confirmed

Tracked against jobs

  • Shingles and underlayment by the square
  • Drip edge, ridge vent and flashing
  • Fasteners and sealant
  • Dumpsters and lifts
  • Siding, trim and gutter stock

Questions

Roofing, specifically

Can it handle insurance restoration work?

Yes. An insurance job gets its own stage for scope and supplements, with the adjuster's details and the documentation photos attached to the job rather than scattered across phones.

How do crews get their assignments?

On their phone, as a list of today's work with addresses, soonest first. Reschedule on the board and their list updates. No group text required.

Does it do aerial measurements?

It does not produce them, and we will not pretend otherwise. It stores the squares and the report against the job so the number everybody works from is the same one.

Get in touch

Let's talk about your roofing business

Based in Nashua, NH, working with contractors across New Hampshire. One call, no obligation, and an honest answer about whether we can help.

0/4000

Goes straight to my inbox. No newsletter, no CRM sequence, no sharing it with anyone.