Job tracking built for excavation and site work
From the first site walk to final grade, every dig in one place — without asking your operators to become data entry clerks.
What we hear
What usually goes wrong in excavation
The schedule lives in your head
You know which machine is where and who is on it, but nobody else does. Every morning starts with four phone calls, and when you are down in a hole with no signal the whole crew stalls.
Dig Safe and permits get remembered late
The 811 ticket has a clock on it and so does the wetlands permit. Missing one does not cost a day, it can cost the job. These belong on a checklist that will not let the dig start without them.
You find out a job lost money months later
Trucking, fuel, rental on the compactor, the extra load of crushed gravel. By the time it reaches the accountant the job is closed. Cost should land against the job the day it happens.
Change orders live on a truck seat
The homeowner asked for another twenty feet of driveway and someone wrote it on the back of an envelope. Then you bill the original number.
Your pipeline
The stages we would set up on day one
Not a blank board. These are the steps your work already moves through, named the way you already name them — and you can rename or reorder any of them yourself.
- 01Lead
- 02Site Walk & Estimate
- 03Proposal Out
- 04Permits & Dig Safe
- 05Equipment & Materials Assigned
- 06In Progress
- 07Final Grade & Walkthrough
- 08Invoiced
- 09Closed
Stage checklist
Permits & Dig Safe
Move a job into this stage and these appear automatically, each one already assigned to whoever owns it.
- Submit Dig Safe 811 ticket (72 hours minimum)
- Confirm all utility marks on site
- Driveway or curb cut permit filed with the town
- Wetlands setback confirmed against the plot plan
- Erosion control plan on file
- Abutter notification if required
Tracked against jobs
- Excavators, loaders and compactors
- Crushed gravel, bank run, loam and stone by the yard
- Pipe, geotextile and drainage structures
- Trucking and disposal loads
- Rented attachments
Questions
Excavation, specifically
Will my operators actually use it?
That is the whole design constraint. On a phone an operator sees one list: their tasks for today, soonest first, with a thumb-sized checkbox. No dashboards, no reports, no training day. If it takes more than a few seconds they will go back to texting you, and we would rather build for that reality than against it.
Can it handle time and materials as well as fixed price?
Yes. A job carries an estimate and then accumulates real cost against it — labor, materials, trucking, rental. Fixed price jobs show margin eroding while there is still time to do something about it. Time and materials jobs give you a defensible number to bill.
We only run four or five jobs at a time. Is this overkill?
It is sized for exactly that. Tools built for two hundred crews carry two hundred crews of settings, which is why they get abandoned. Five live jobs on one board, each showing stage, cost against estimate and what is blocking it, is a tool you can run from the cab.