Linear-foot work that stays profitable
Measured runs, gate counts and post holes that match what you quoted — and an 811 ticket the job will not start without.
What we hear
What usually goes wrong in fencing
Gates and corners are where the money goes
Two hundred feet of straight cedar on flat ground prices itself. Six corners, a grade change and two gates is a different job, and quoting it like the first one is how a week disappears.
Dig Safe and the property line
You are putting forty holes in the ground. One unmarked service or one run set on the neighbor's side of the pin takes the whole job's profit, and sometimes more than that.
Material is a third of the job and gets ordered from memory
Post count, rail count, panel count, concrete, hardware. Ordered off a sketch rather than the measurement, it is either two trips to the supplier or a pile of leftovers you paid for.
Customers change the plan once they see the string line
They want the gate four feet over and the run to stop at the shed. All reasonable — but it has to become a change order with a number, not a nod in the yard.
Your pipeline
The stages we would set up on day one
Not a blank board. These are the steps your work already moves through, named the way you already name them — and you can rename or reorder any of them yourself.
- 01Lead
- 02Site Measure & Quote
- 03Quote Out
- 04Approved & Deposit
- 05Permits & Dig Safe
- 06Material Ordered
- 07Layout & Post Setting
- 08Panels & Gates
- 09Final Walk
- 10Invoiced
- 11Closed
Stage checklist
Permits & Dig Safe
Move a job into this stage and these appear automatically, each one already assigned to whoever owns it.
- Dig Safe 811 ticket submitted (72 hours minimum)
- Utility marks confirmed on site against the fence line
- Property pins located, or the survey on file
- Town zoning or fence permit filed where required
- Fence line, gate positions and swing walked with the customer
- Association or abutter approval on file if needed
Tracked against jobs
- Posts, rails and panels by count
- Chain link fabric and wire by the foot
- Gates, hinges, latches and hardware
- Concrete bags, gravel and post mix
- Augers, post drivers and the mini skid
Questions
Fencing, specifically
Will it price a fence by the foot for me?
It stores your measurement and the rates you chose, so the quote, the material pull and the invoice all come from one set of numbers. It does not carry its own price book — a national average price for cedar post-and-rail is worse than useless to you.
How do change orders work when somebody moves a gate?
Added on the spot, on the phone, in front of them, with a price and a signature. The point is not the paperwork, it is that the extra forty feet never silently becomes free because it was agreed in a yard on a Thursday.
We do repairs and small jobs too. Does each one need all of that?
No. A repair is a two-stage job with no permits and no material order, and it lives on the same board as a four-day install. The pipeline is the longest path, not a toll gate every job has to walk through.
Get in touch
Let's talk about your fencing business
Based in Nashua, NH, working with contractors across New Hampshire. One call, no obligation, and an honest answer about whether we can help.