Paving jobs that stay profitable

Tonnage, trucking and crew hours tied to the driveway they went into, while the season is still young enough to fix.

What we hear

What usually goes wrong in paving

Margin is a mystery until the plant invoice arrives

Asphalt is most of your cost and it moves with the index. If tonnage is not logged against the job the day it is laid, you are guessing at margin for weeks.

Weather reshuffles the week constantly

One cold rain and four jobs slide. Doing that reshuffle on a whiteboard means somebody always gets forgotten.

Sealcoating is high volume and low ceremony

Twenty small jobs in a week need one tap to complete, not a form. Anything heavier and they simply will not get marked done.

Striping and line work get billed inconsistently

Add-ons are agreed verbally on site and never make it onto the invoice.

Your pipeline

The stages we would set up on day one

Not a blank board. These are the steps your work already moves through, named the way you already name them — and you can rename or reorder any of them yourself.

  1. 01Lead
  2. 02Measure & Quote
  3. 03Proposal Out
  4. 04Scheduled
  5. 05Materials & Equipment Assigned
  6. 06Prep & Base
  7. 07Paving In Progress
  8. 08Striping & Finish
  9. 09Invoiced
  10. 10Closed

Stage checklist

Prep & Base

Move a job into this stage and these appear automatically, each one already assigned to whoever owns it.

  • Area measured and confirmed against the quote
  • Existing surface milled or removed
  • Base compacted and graded to drain
  • Utilities, drains and castings located and protected
  • Plant order placed for the paving date
  • Customer notified about access and cure time

Tracked against jobs

  • Hot mix by the ton, binder and top course
  • Sealer, crack filler and striping paint
  • Pavers, rollers and milling machines
  • Trucking loads to and from the plant
  • Tack coat and release agent

Questions

Paving, specifically

Can I see cost per ton against the quote?

Yes. The job holds quoted tonnage and actual logged tonnage side by side, with trucking and labor on top, so an overrun is visible the same week rather than in the fall.

How does rescheduling work?

Move a job and the crew sees it on their list immediately. When a week gets rained out you are reordering a board, not rebuilding a schedule from scratch.

Is there anything for small sealcoat jobs?

They are the reason the mobile view is one list with checkboxes. A driveway sealcoat should be two taps from pulling up to driving away.

Get in touch

Let's talk about your paving business

Based in Nashua, NH, working with contractors across New Hampshire. One call, no obligation, and an honest answer about whether we can help.

0/4000

Goes straight to my inbox. No newsletter, no CRM sequence, no sharing it with anyone.