Paving jobs that stay profitable
Tonnage, trucking and crew hours tied to the driveway they went into, while the season is still young enough to fix.
What we hear
What usually goes wrong in paving
Margin is a mystery until the plant invoice arrives
Asphalt is most of your cost and it moves with the index. If tonnage is not logged against the job the day it is laid, you are guessing at margin for weeks.
Weather reshuffles the week constantly
One cold rain and four jobs slide. Doing that reshuffle on a whiteboard means somebody always gets forgotten.
Sealcoating is high volume and low ceremony
Twenty small jobs in a week need one tap to complete, not a form. Anything heavier and they simply will not get marked done.
Striping and line work get billed inconsistently
Add-ons are agreed verbally on site and never make it onto the invoice.
Your pipeline
The stages we would set up on day one
Not a blank board. These are the steps your work already moves through, named the way you already name them — and you can rename or reorder any of them yourself.
- 01Lead
- 02Measure & Quote
- 03Proposal Out
- 04Scheduled
- 05Materials & Equipment Assigned
- 06Prep & Base
- 07Paving In Progress
- 08Striping & Finish
- 09Invoiced
- 10Closed
Stage checklist
Prep & Base
Move a job into this stage and these appear automatically, each one already assigned to whoever owns it.
- Area measured and confirmed against the quote
- Existing surface milled or removed
- Base compacted and graded to drain
- Utilities, drains and castings located and protected
- Plant order placed for the paving date
- Customer notified about access and cure time
Tracked against jobs
- Hot mix by the ton, binder and top course
- Sealer, crack filler and striping paint
- Pavers, rollers and milling machines
- Trucking loads to and from the plant
- Tack coat and release agent
Questions
Paving, specifically
Can I see cost per ton against the quote?
Yes. The job holds quoted tonnage and actual logged tonnage side by side, with trucking and labor on top, so an overrun is visible the same week rather than in the fall.
How does rescheduling work?
Move a job and the crew sees it on their list immediately. When a week gets rained out you are reordering a board, not rebuilding a schedule from scratch.
Is there anything for small sealcoat jobs?
They are the reason the mobile view is one list with checkboxes. A driveway sealcoat should be two taps from pulling up to driving away.